WANGDA CARRIED ON THE INSTALLATION FOR SUPPLIED MUSEUM DISPLAY CASES FOR FORT ST.ELMO-A MUSEUM PROJECT UNDER EUROPEAN UNION

25 Mar

FOR EUROPEAN UNION MUSEUM PROJECT-FORT ST.ELMO,WANGDA DISPATCHED PROFESSIONAL AND EXPERIENCED INSTALLATION STAFF TO THE MUSEUM SITE AND INDEPENDENTLY COMPLETED ALL THE INSTALLATION WORK FOR ALL THE SUPPLIED MUSEUM DISPLAY CASES.7 DISPLAY CASES WERE DESIGNED IN IRREGULAR STRUCTURE AND SHAPE BESIDES THE EXTERNAL NEEDS TO BE CLADDED WITH GLISTER GALVANIZED STEEL PANEL.ONE DISPLAY CASE IS REQUIRED TO ENSURE THE TOP TO UNDERTAKE AN AIR CRAFT AT ABOUT 2 TONS.FOR THE INTERIOS OF ALL THE MUSEUM DISPLAY CASES,ALL INVOLVED TIMBER PANELS ARE ZF-MDF(COMPLETELY ZERO FORMALDEHYDE) AND WRAPPED BY THE MUSEUM DEDICATED FABRIC FROM BAUMAN CREATION.

20141104_084322

20141104_133437

20141104_142358

20141105_120659

20141105_125600

20141107_123320

20141107_194617

20141111_160317

20141112_115747

20141113_101642

20141113_124658

20141115_112925

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: